Tulloch Updated 2024 Fill Schedule
The 2024 Spring refill schedule for Tulloch Reservoir is provided below. This schedule complies with U.S. Army Corps of Engineers flood control requirements. The reservoir will generally be managed to the target elevation range, however some variation may occur due to large local inflows.
DATE | ELEVATION FROM | ELEVATION TO |
---|---|---|
28 Feb to 05 Mar | 495 | 498 |
06 Mar to 12 Mar | 496 | 499 |
13 Mar to 19 Mar | 497 | 500 |
20 Mar to 26 Mar | 498 | 501 |
27 Mar to 2 Apr | 499 | 502 |
3 Apr to 9 Apr | 500 | 503 |
10 Apr to 16 Apr | 501 | 504 |
17 Apr to 23 Apr | 502 | 505 |
24 Apr to 30 Apr | 503 | 507 |
1 May to 7 May | 504 | 507 |
8 May to 14 May | 505 | 508 |
15 May to 21 May | 506 | 509 |
22 May to 28 May | 506.5 | 509.5 |
29 May to 15 Sep | 506.5 | 509 |
Note: Lake Tulloch Spring Refill Schedule
Ordered by: P. Manza